Compare Salt Lake City bathroom remodel estimates side by side. Call (855) 215-7855 or describe your project once and participating local pros send Risk-Free Estimates. No obligation.
What bathroom remodeling services are available in Salt Lake City?
Participating Salt Lake City pros handle full remodels of rambler and brick-home bathrooms, basement bathroom additions, walk-in showers, tub-to-shower conversions, double-vanity and family-sized layouts, and accessibility upgrades. The two most common Salt Lake requests are a new bathroom in the basement and a hall bath rebuilt for a large household, and every estimate in the valley has to answer the hard-water question.
Full bathroom remodels. The rambler hall bath, rebuilt: open the walls, replace galvanized supply, add an exhaust fan vented outside, update the electrical, and rebuild in a layout that works for a large household. In the Avenues, Capitol Hill, Liberty Wells and Sugar House, it is an original bathroom in a brick home brought current while respecting the house.
Basement bathrooms. Nearly every Salt Lake City home has a full basement, and finishing it is how a three-bedroom rambler becomes a six-bedroom home. A basement bathroom means below-grade drains, often an ejector pump, moisture control on the walls, egress and radon considerations, and ventilation to the outside. It is one of the most common requests in the valley.
Walk-in showers and tub-to-shower conversions. Requested across the 1950s to 1970s neighborhoods and by anyone planning to stay in a house with a staircase to the basement. Benches, hand-held sprays, grab-bar blocking and slip-resistant floors as standard.
Double vanities and family-sized layouts. Salt Lake households tend to be large, and the most frequent layout request is two sinks, a separate toilet room and more storage. Borrowing space from a closet or hallway is common and permitted.
Shower-to-tub conversions, bath liners, fixture replacement, floor tiling, accessibility. Comfort-height toilets, slip-resistant porcelain, reinforced grab bars. For a seated bathing option see walk-in tubs.
Why are Salt Lake City bathrooms different?
Salt Lake City bathrooms contend with some of the hardest water of any major American city, a full basement under nearly every house, unreinforced brick walls in the pre-1940 neighborhoods, dry air that shrinks grout and caulk, and winters that freeze supply lines in exterior walls. Scale, basements and brick are the local conversation, in that order.
Very hard water. Wasatch Front water is among the hardest in any major American city, and it shows: white scale on glass in a week, crusted aerators, shortened water heater life. Most remodels in the valley either include a softener or specify coated glass, brushed or matte fixtures, and ceramic-disc valves that tolerate mineral buildup.
Basements and the frost line. Deep basements are the norm, and the drains serving them often sit below the sewer line, which means an ejector pump. Older basements in the Avenues and Sugar House have unfinished stone or brick walls that need moisture management before any finished bathroom goes in.
Unreinforced brick. Many pre-1940 homes are unreinforced masonry, and a bathroom on an exterior brick wall has no stud cavity for plumbing or a niche. Pros fur out the wall or route plumbing on interior framed walls. Seismic retrofits are often discussed while the walls are open.
Dry air and cold winters. Humidity is low most of the year, so mold is less of a threat than elsewhere, but the dry air shrinks wood, grout and caulk, and supply lines in exterior walls freeze in January. Flexible sealants and moving lines inboard when the wall is open are standard practice.
Permits. Salt Lake City Building Services permits plumbing, electrical and structural work inside city limits. Millcreek, Holladay, South Salt Lake and the rest of the county permit through their own offices.
How much does a bathroom remodel cost in Salt Lake City, and how long does it take?
A mid-range full bathroom remodel in Salt Lake City typically runs $14,000 to $28,000 within the existing footprint, and a tub-to-shower conversion $7,000 to $15,000. A new basement bathroom usually lands between $15,000 and $32,000 with an ejector pump, and a whole-house softener adds $1,500 to $4,000. Conversions take two to five working days and full remodels three to five weeks.
- Tub-to-shower conversion: $7,000 to $15,000, two to five working days.
- Full remodel in the existing footprint: $14,000 to $28,000, three to five weeks.
- New basement bathroom with ejector pump: $15,000 to $32,000.
- Whole-house water softener: $1,500 to $4,000; furring out a brick wall for plumbing: $800 to $2,500.
- Permit: Salt Lake City Building Services inside city limits; Millcreek, Holladay and South Salt Lake issue their own. The pro pulls it.
Which Salt Lake City neighborhoods do we hear from most?
The Avenues and Capitol Hill, 1890s to 1920s brick homes with original bathrooms. Sugar House, Liberty Wells and 9th and 9th, bungalows and basements being finished. Rose Park and Glendale, 1950s brick ramblers ready for walk-in showers. East Bench and Yalecrest, mid-century homes with family-sized remodels. Millcreek and Holladay, just outside the city, with the same ramblers and the same hard water.
How does the bathroom remodel process work in Salt Lake City?
The process has four steps: a consultation that checks the exterior wall construction and the basement drain situation, written estimates with the hard-water choices spelled out, construction, and a final walkthrough. Allow six to ten weeks of calendar time for a full remodel; a basement bathroom never takes the main bathroom out of service.
- Consultation. Submit the form or call. Participating pros that serve your Salt Lake City zip code visit, measure, check the exterior wall construction, and look at the basement drain situation if the plan involves one.
- Design and estimates. Written estimates with scope, materials, hard-water choices, any ejector or furring work, and a schedule. Compare them side by side.
- Construction. Conversions take two to five working days. Full remodels run three to five weeks. Basement bathrooms depend on drain depth and wall work.
- Final walkthrough. Fixtures run, fan tested, permit inspections closed, then final payment.
Compare written estimates from participating Salt Lake City pros. Call (855) 215-7855 or request Risk-Free Estimates.
Recent projects and reviews in Salt Lake City
Frequently asked questions
How much does a bathroom remodel cost in Salt Lake City?
Estimates in the Salt Lake area typically run $14,000 to $28,000 for a mid-range full remodel within the existing footprint and $7,000 to $15,000 for a tub-to-shower conversion. A new basement bathroom with an ejector pump is its own range. Written estimates from more than one pro are the only reliable number.
Is a water softener worth adding during the remodel?
With Wasatch Front water, most pros will say yes if there is not one already. If you skip it, specify coated glass and brushed finishes and plan on regular descaling of the showerhead.
Can I add a bathroom in my basement?
Almost always, a Salt Lake City basement can take a bathroom. The pro checks where the main drain exits; if the new fixtures sit below it, an ejector pump goes in. Moisture control and egress come first in older basements.
My bathroom is on a brick exterior wall. Can plumbing go there?
Plumbing cannot run inside a brick exterior wall. Pros fur out the wall a few inches to make a cavity, or put the plumbing and any niche on an interior framed wall. The consultation settles which walls are brick.
Do I need a permit?
Yes for plumbing, electrical or structural changes. Salt Lake City or your county municipality issues it, and the pro pulls it. A straight fixture swap generally does not need one.
How long will the bathroom be out of service?
Two to five working days for a conversion. Three to five weeks for a full remodel. Basement bathrooms do not take the main bathroom out of service at all.
